XB
-
Designed in house and calibrated with a matched ecm, average HP gain is +10% over stock
Fits 2008-2010 model XB12, outlet style may differ from picture. Pre-programmed ecm is included. Calibration developed using wideband O2 sensors.
Everything here is hand fabricated in house, there is a short lead time of 2 to possibly 6 weeks to build as all systems are built to order.
-
Designed in house and calibrated with a matched ecm, average HP gain is +10% over stock, tuning is REQUIRED.
Fits all XB models, outlet style may differ from picture.
Everything here is hand fabricated in house, there is a short lead time of 2 to possibly 6 weeks to build as all systems are built to order.
-
Polished in house, not a full mirror shine or perfectly smooth. Some surface tooling marks may be visible from mandrel bending. This is per section. Headers are separate from the muffler, so a full system requires 2. Slip-on units are considered as one unit.
-
Built in house and calibrated with a matched ecm, average HP gain is +10% over stock, tuning is REQUIRED.
Fits all XB models, outlet style may differ from picture. This is based on a Magnaflow 11148 muffler and has slightly better ground clearance than a stock exhaust. This example does not come with an ECM.
Everything here is hand fabricated in house, there is a short lead time of 2 to possibly 6 weeks to build as all systems are built to order.
-
Cerakote High Temp ceramic. Reduces heat from the exhaust. Per section, headers are separate from the exhaust.
-
Designed in house and calibrated with a matched ecm, average HP gain is +10% over stock, utilizing a Magnaflow 11148 muffler.
Fits 2008-2010 model XB12, outlet style may differ from picture. Pre-programmed ecm is included. Calibration developed using wideband O2 sensors.
Everything here is hand fabricated in house, there is a short lead time of 2 to possibly 6 weeks to build as all systems are built to order.
-
Designed in house and calibrated with a matched ecm
Fits 2008-2010 model XB9, outlet style may differ from picture. Programmable ecm is included. Calibration developed using wideband O2 sensors.
Everything here is hand fabricated in house, there is a short lead time of 2 to possibly 6 weeks to build as all systems are built to order.